Vítkovice, a.s Detailed inspection of the dispatch hall of the old pressing plant (CZ)
Elektrárna Dětmarovice, a.s. Static assessment of the steel structure of the absorber building after a fire (CZ)
SE-MI Technology, a.s. Static assessment of the steel structures of the sorting line of the material extracted from the Heřmanice mining in Ostrava (CZ)